4-1.2-ME Gas sampling and gas conditioning technology 15
11.1 RETROFITTING OF THE WALL MOUNTING HOUSING TO A 19“-HOUSING
The gas conditioning units CSS-V.. are delivered with a wall mounting housing.
If a 19”-housing is needed, the gas conditioning unit can be backfitted very easy by installing the
mounting brackets from the back to the front:
Dismount the two fixing screws at each mounting bracket
Adjust the mounting bracket with 19“-bore holes forward-turned
Fix the mounting bracket flush with the front panel at the housing by using the two fixing
screws
12 SUPPLY CONNECTIONS
12.1 HOSE CONNECTIONS
Figure 5 Hose connections CSS-V
NOTE!
Do not mix up the hose connections.
After having connected all lines, please check the seals.
Contrary to figure 4 execution CSS-V2 has two sample gas outlets.
The condensate connections are carried out directly at the peristaltic pump.
All hose connections are DN4/6mm sealing ring threaded hose couplings out of PVDF/PPH as
standard. They are suitable for gas inlet temperatures of maximum 80°C (see chapter 8).